Sunday, April 10, 2011

Not all Toads live at Ground Level

The rooftop work is a hoppin' at the House of Toads. The east side roof that includes the gallery and commercial kitchen received it's red steel roof on Saturday, April 9th. Herr and Madam Toad carried the 22 foot long steel from the pile to the base of the ladder and the engineering Toad brain figured out a strategy for safely hoisting each sheet into it's place.

The following photo shows Herr Toad looking over his work, the long steel sheets in place.

And here, Herr Toad is measuring twice, cutting once, the pieces of steel that hold the sofit.

We are grateful the rain held off. By the end of the day, this section of roof was complete.

2 comments:

  1. Friends, I am problem solving the issue of leaving a comment. It looks like some sort of account is needed.--I will try posting as a Google Account. --Eileen, the toad.

    ReplyDelete
  2. I have modified the settings so that anyone can comment. If you have trouble, please let me know! Eileen, the toad

    ReplyDelete